More about Mantri WebCity

Mantri WebCity is the new residential Apartment project launched in Hennur Bagalur Road, Bangalore.

The residential enclave Mantri WebCity features the very best in Mantri Developers’ luxury living segment. The project offers spacious Apartments with luxurious features.

Beautiful landscapes all around Mantri WebCity makes it more special & Elite.

The builder is guaranteed to bring a quality living experience to the community of Hennur Bagalur Road, North Bangalore with brilliant architecture and equivalent lifestyle in Mantri WebCity.

Mantri WebCity Location has excellent connectivity & it is located at the crux of Hennur Bagalur Road near existing and upcoming communities & facilities.

Amenities at Mantri WebCity include a fully equipped clubhouse, landscaped gardens, gymnasium, swimming pool, recreation rooms, outdoor sports courts, children’s play area, party hall, and meticulously planned with utmost importance to state-of-the-art 24/7 securities.

Mantri WebCity Configuration

The Information mentioned here was Last Updated on 28-Mar-2024

location-map
Project Location
Hennur Bagalur Road
total-land-area
Total Land Area
44.26 Acres
no-of-units
No. of Units
2171 Units
development
Towers and Blocks
22 Blocks
2B + G + 15 Floors
types-of-units
Unit Variants
2,3 BHK
possession
Possession Time
Jun 2020 Onwards
Unit TypeSize in Sq.Ft
3 BHK1445
3 BHK1740

Join “Group Buy” to Avail Guaranteed Lowest Price

Group Buy Homz N Space NEW 2021

Location of Mantri WebCity

Maps

Mantri WebCity Location Address :
Near Southern Asian Bible College Kothanur Post, Hennur Main Road, Narayanapura, Bengaluru, Karnataka 560077

Master Plan & Floor Plans –  Mantri WebCity

Mantri WebCity Specifications

structure-specifications-homznspace
Structure
  • RCC framed structure Building.
  • Concrete Solid Block Masonry (Int & Ext) – 200MM Exterior walls, 100MM Interior walls.
floorings-specifications-homznspace
Flooring
  • Vitrified Flooring in Living, Dining (Premium).
  • Anti Skid Ceramic Tile flooring (premium).
doors-specifications-homznspace
Doors
  • Main door – Engineered door frame with veneer finished shutter with good quality hardware and security eye.
  • Bathroom doors – High Standard door frame with a shutter of veneer finish outside and laminated finish inside with good quality hinges and thumb-turn lock.
plumbing-specifications-homznspace
Plumbing and Sanitary
  • Premium branded CP fittings (Roca/Jaguar/Kohler/American standards/Grohe/Moen or equivalent) and sanitary fixtures (Kohler/Toto/Roca/Hindware/Jaguar/Parryware/American standards or equivalent).
  • Rainwater Harvesting drain pipes included.
security-specifications-homznspace
Security
  • Automatic passenger lifts are provided in each block with emergency phone facility connected to security cabin with D. G. backup.
  • Round the clock security with intercom facility.
  • CCTV Camera at all vantage points.
electrical-specifications-homznspace
Electrical
  • Grid Power from BESCOM for each home.
  • Premium Modular switches.
  • Copper electrical wiring all throughout via concealed conduits.
  • 100 percent D.G. back-up for common area lighting, pumps, and lifts.

Mantri WebCity Amenities

gym-amenities

Gymnasium

club-amenities

Clubhouse

swimming-pool-amenities

Swimming Pool

billiards-amenities

Games Room

yoga-activity-amenities

Activity Area

walking-jogging-amenities

Jogging Track

tennis-amenities

Outdoor Courts

table-tennis-amenities

Table Tennis

gardens-amenities

Landscaped
Gardens

play-area-amenities

Kids Play Area

supermarket-amenities

Retail Spaces

party-amenities

Party Area

Mantri WebCity Price

Unit TypeSize in Sq.ftApprox. All Inclusive Price
3 BHK1445Rs. 98 Lacs Onwards
3 BHK1740Rs. 1.16 Crore Onwards
Complete Costing Details BannerB
Components considered in the above mentioned Approx. All Inclusive Price are :
Basic Price, GST, Car Parking Charges, Legal Charges, Club House Charges
Maintenance Deposit, BWSSB & BESCOM Charges
*Preferred Location Charges Extra
*Franking Charges, Stamp duty & Property Registration Charges Extra as per Govt Norms.

Expert Opinions on Mantri WebCity

  • Close Proximity to Manyata Tech Park, Hennur, Thanisandra Road, Hebbal, ORR as well as existing communities of residents with health facilities, schools, and amenities in the immediate vicinity.
  • North Bangalore is fast developing and a highly sought-after area with the Project located in a strategically prime location which is good for Investment purpose and Self-use.
  • The Brand name of Mantri Developers is a good boost combined with Competitive Pricing and the project location.
  • Certain Traffic Bottlenecks during peak hours while accessing major parts of North Bangalore.
  • Civic amenities are still developing in the vicinity of the project to an extent.

More about the Builder – Mantri Developers

Mantri Logo

In the supremely dynamic and competitive sphere of property development, one name has consistently been a trail blazer, setting the trends for others to follow. The innovation-led, future-focused Mantri Developers Pvt. Ltd.Established in 1999 by Mr. Sushil Mantri, the company has been the pioneering force behind the rapidly changing skyline of south India, with developments that span the residential, retail, commercial, education and hospitality sectors.

In just 16 years, the group, with the spirit of innovation at its core, has carved a niche for itself as an industry benchmark for quality, customer focus, robust engineering, in-house research, uncompromising business ethics and the unswerving commitment to timeless values and total transparency in every aspect of its business. These exceptional attributes have made Mantri Developers one of India’s most preferred real estate brands in south India.

Mantri Developers is now leveraging this expertise by foraying into competitive international markets such as Dubai, Singapore and the USA. Domestically though, it will continue to focus on residential, retail, office, hospitality, townships and educational institutions in the high-growth urban centres such as Bengaluru, Chennai, Hyderabad and Pune.


Ongoing

17 Projects

Upcoming

5 Projects

Completed

32 Projects

How to Book this Property?

booking-process-homznspace

Frequently Asked Questions (FAQs)

What is the price of 3 BHK in WebCity?

The price of a 3 BHK unit starts from 98 Lakh Rupees onwards in this project.

What are all the Special Discounts or Offers available for this project?

Exclusive Group Buy Offer, Seasonal Schemes & Deals available ONLY through Homz N Space for special offers and deals. CALL 9590144144

Where is WebCity located in North Bangalore?

The project is located in Hennur Road just off Thanisandra, Outer Ring Road, Manyata Tech Park, Hebbal, and Horamavu. It's a fast-developing area and is a Good investment option.

Mantri WebCity Reviews

3.4/5 (38 Reviews)

Orchid Life Homz N Space Banner 550px

General Multi Choice Form

Let the Experts help you find the Best Property :
_____________________________

A FREE Initiative by Homz N Space  |  We Charge ZERO Commission or Brokerage

Harish Achar is the Founder of Homz n Space. He's a Passionate Real Estate Professional. Harish is an MBA from IFIM in Marketing & IT. He has served industry's most Top-line companies like DLF, Ajmera, Indian Express Etc… After serving to multiple real estate firms, Harish identified that: There is no online platform which provides unbiased reviews, expert advice to homebuyer’s queries and a platform for property seekers to get the best possible discounted price for the property of thier choice. So, as a team, He started a new online & offline platform called “Homz N Space” in the year 2011 along with a group of members who had similar work experience and a same kind of vision. Today, as a company, We are proud to state that we are the most trusted real estate platform for property seekers to get Lowest Price in the market along with Expert Advice. We are currently handling 650+ Real Estate Projects & We have successfully helped 7,000+ Property Seekers to identify their dream home at best-discounted price through our free Consulting & Group Buy Model.
Subscribe
Notify of
280 Comments
Inline Feedbacks
View all comments
Santigopal Mondal

Hi Harish,
Is it worth to buy a 3bhk flat in parcel 3, now that it’s ready to move in? Can you please advise.

Manoranjan Kumar

First of all, I am not believing on Mantri developer for whatever reason. They will call customer , they will trap customer, they will cheat customer, they will enforce to buy the flat.
I booked the flat on 4th March 2018 while booking the flat I told will let you know the flat number in 1-2 days,I informed about J1106 on 5th March .I booked the flat on Mantri terms and condition, I need to pay 3-5%, remaining amount I don’t have to pay till possession. If Mantri would have told me about some other condition, I would have thought differently.
From 5th March 2018 till 20th June 2018,Mantri developer was telling it is in progress. Your J1106 is under process. I visited few times there, everytime it is informed some other reason, like My team is very slow, Madam is not available. I was forcing regularly for agreement . I went home on 20th June 2018,before leaving home, I informed Kiran. On 20th June 2018, Mantri developer told me your flat was of investor unit, they are not finalising the property, you need to pay 10%.I told will discuss with family and will let you know. I informed I will pay 10% at condition if my agreement will be ready, at that time I will pay the remaining amount. After that I was following on daily basis about my agreement. Everyday it had been told.. It is getting ready, by next week it will be ready. On 8th August 2018,I had informed J1106 is not possible, because investor is asking for amount which will be difference of 7-8 lakhs . I need to pay extra money for J1106.My question is that what Mantri was doing with the customer for last 5 Months? Again I got new twist on 25th August 2018. I got to know Mantri had bought from investor, if you want to buy J1106,you have to pay extra GST,this Mantri developer is cheating with the people. If they don’t want to sell the flat, why did Mantri engage the customer so long. Before booking the flat, Mantri webcity review is the worst of all, I informed Mantri about the review, they told it is incorrect. My last impression is that they are biggest cheater.
Story does not end here, it continues…
Once they informed me about cancellation of J1106 on 8th August 2018, I told will discuss with family and will let you know what I have to do. I went ahead with J1006, I told them I want written mail for going ahead with J1006, so that it should not repeat it should not take more time. Again started following everyday, everyday same reply what was earlier. One day, I decided to go to office and will ask for final things to do on 25th August 2018. They told story about the J1106. For J1006 they told I have to pay 15%, then Mantri will proceed to do the agreement. Once I calculated the amount it is not 15%, it is actually 20%.

My question is that :
Mantri webcity is your project, I didn’t enforce you to do some concession, even I have not negotiated any price, what they told I agreed upon it, why did you take my so much time. It should come before booking the flat. Is it way from Mantri, how to trap the customer, how to befool the customer ? How to make the money? How to treat with customer?

Jackson Philips

I booked a 3bhk apartment with Mantri at the Webcity project and also paid a sum of Rs.1, 00, 000. Even after 2 months there was no developments in the paper work and all our requests to make minor changes to the apartment and the documents were declined. The draft document that was sent had everything in favor of the Developer and in case we failed or delayed a payment it would cost us dearly.
There was nothing holding the Developer responsible.
I discussed with my lawyer and he recommended that I get out of this project, since there are 1000s of unhappy customers in multiple projects of Mantri. When initially booked the apartment, they said if there were any issues on Mantri’s side they would refund the amount immediately.
When I actually cancelled the booking, they do not want to refund the money and now say that they will only pay it back once they have sold that particular unit.

I will be raising a complaint with RERA and I’m willing to spend Rs.1000 for it aswell.
Anyone thinking of purchasing Mantri Apartments, please understand that they do not have funds and are waiting for your money to proceed. Eventually, they will go bust because of RERA penalties. Once they go bust, all ongoing projects will stop and all the customers who have put their money in Mantri expecting to get an apartment after a few year will be running pillar to post trying to get a legal solution. Trust me, Mantri Management will escape and the customers will remain unhappy.

Roshni Gowda

webcity had certain issues earlier , now they are on track and earlier issues are resolved

kamakhya Gupta

Can you give more data what is Rsolved? I am having hard time getting the possession or money back.

Jackson Philips

Roshni, I’m glad to see that your issue have been resolved. You are one of the lucky ones, but there are 1000s of us who are left feeling cheated.
I’ve been following up with the CRM team for months together and the HEAD of CRM calls up every time and talks to me in a Condescending attitude. They talk to me as if I owe them money.
All their documents will only talk about how the customer is liable for any issues. Their subvention scheme is too good to be true and it will sound so amazing when you hear it verbally. But when you look at the actual document that you need to sign, you will never see anything which states that Mantri will be responsible for anything.
I waited 2 months after giving them the booking amount and there was no news from Mantri on when the Agreement needs to be signed. When I asked for clarification and ammendments to their draft agreement , the CRM lady just said that it was standard and all their customers are happy to sign it.
Fortunately for me there’s a Sales person called Avinash who atleast knows how to talk to a customer. I’m trying to settle this case through him. The CRM at Mantri is just pathetic.

Manika

As of today , is it good to invest in parcel 3 for 3bhk @ 5700rs with 25-75 scheme. Possession in nov 18.
Please suggest.

kamakhya Gupta

I booked this I a pre EMI scheme, not all deadline is over. Mantri has defaulted payments for 11months. Not sure what to do all our hard earned is at stake.

Jackson Philips

Kamakhya,
I feel your Pain. Unfortunately that is they way they work. They lure poor customers into their ponzi scheme and after they get the initial amount they know you are stuck and will be forced to pay. They also prefer people taking the apartments on loan since the banks will release 90% of the funds to the Builder and the customer will have to deal with the payment there after.
As mentioned many times before, their documents keep them safe from any consequences. I raised a complaint with RERA by paying 1000 rupees. I really don’t think it is going to help, but i did my part. Next i’ll approach the press if they don’t give me my money.
Do a favor to your friends and family, spread the new about this deceit.

Jackson Philips

Manika Trust me.. Please do not book it.. NOV 18 possession is not going to happen. I discussed this with my Lawyer and he recommended I invest my money in some mutual fund rather than putting it in Mantri

Ananth

P2 is delayed by 4 years (on paper) reality we need to wait and see. Paid 90℅ of total cost already

BP

Hi Harish, Please advise as soon as possible. Raja Kaluve has become big issue in Bangalore these days as you are aware.

BP

Hi Harish, There are two water streams in Mantri Webcity shown in the image in the link below. Are they Raja Kaluves? Have they got approval from Govt Authortities? Please advise as I have almost decided to buy the apartment in Mantri Webcity.

http://www.homebuyersvoice.com/wp-content/uploads/2014/05/Mantri_Webcity_Featued-image.jpg

amit

It was my worst decision to sign up for Mantri webcity buy back scheme in Singapore

Nothing realised as promised. Current backlog of 4 months (promised was max 1 to 2 months monthly installment payments that we need to arrange for initially) on pre emi payment and backlog is increasing. I have already paid 4 months from my side to the bank. If Mantri cant keep up their commitment for monthly payments and are not serious enough to reduce the backlog urgently how can we expect of higher returns on our investment in 3 years.

On top of that the time that I need to put in to call them and follow up every month is frustrating. Every two months they assign a new contact person for the tower and only get informed when I call them!. Not at all expected of getting into this mess. Please get yourself educated on the current state well before considering any of your investment with Mantri. Dont recommend at least in the current state the way they are handling existing customers relationship and commitments.

Sincerely,
Owner of Tower R 17-04

Radha

Hi Harish,
We had booked a flat in parcel 2 J block in 2014 under the buy back pre-emi scheme.
They are not paying the pre-emi since 5 months. And the project is delayed till 2019 ( as compared to promised date of 2017).
Upon asking for pre-emi and unlimited follow ups, their deputy CRMs are saying they cannot pay !!!. These developers do whatever they want without any fear and common people like us have to suffer. We are just feeling so helpless where we cannot do anything against these so called reputed builders but just feel CHEATED !!! If they are not able to pay the pre-emi itself, forget about the buy back.
Can you please suggest here something.
And if you know of anyone who had been trapped like us and have found some resolution, please advice.
Thanks and Regards,
Radha

sabemaya

From which angle you have given it a 4 star…..They have delayed Phase 1 possession for more than a year…Phase 2 and 3 possessions are being delayed by 3 yrs….All the pre emi scheme buyers are going through hell with 4-5 month delays. Their team keeps changing, they never keep their promises… It is a hellish experience…

Rajan

Can anyone confirm still the phase 1 is not completed.I heard that phase 1 is completed and phase 2 will be ready by dec 2019.Please confirm whether we can book this property.

Rajan

can anyone let me know whether they are launching phase 2 with expected possession date is 40 months from now and also they are offering 25 % upfront and remaining balance we can pay when the possession happens.

Raja

Hello,
I am planning to buy home in mantri webcity, please suggest me pro’s and cons of this project and even let you share any infro regarding price also they are quoting now 5490 is it worth in this area? or please share all info which you know/came to know

Sunny

Agree with Balaji, One of the worst CRM teams. Leave the individual tower CRM managers, the webcity project’s manager herself is never reachable – she is either switched off or doesn’t pick up the calls. She doesn’t even respond over emails as well. There is no hope of any help in Webcity. If you go by the name of Mantri they are just fooling you. PreEMI is never paid on time, currently 2-3 months of delay.
They keep fooling you with false promises and assurances. Pre-EMIs are delayed, date of the project has been moved so many times(more than a year now).
CRM guys keep blaming other departments for all the issues, either their accounts department or the IT department. Keep fooling customers with wrong information and in the end customers suffers, frustrates. Really bad customer service indeed.
I have lost faith in Mantri now. Definitely worst mistake to go with Mantri webcity.

Ash

Well I am not denying the fact of delays in various parts, whether pre-emi or the delivery of project. I had initially booked the flat in another reputed builder in Bangalore. They had got the permission to build till certain level, but they started selling even higher floors than the approved limit. They are even constructing higher floors. And there is a delay too. Which is illegal and govt won’t issue CC & EC. I was able to cancel the booking from that builder & booked in webcity. Well, I have been getting the response from the CRM in satisfactory time. Sometimes I needed to send reminder emails, but I have been getting the response. People have threatened MS Doni (brand ambassador of Amarpalli Group) for delays & poor quality. At least in Mantri Webcity, that’s not the case. Delay is in almost every large project. I am not favoring or endorsing Mantri at all. I will be happy to get it delivered on time, but I understand the delay is sometime not in their hand. I hope Mantri will not do any unethical thing with us. Well, this is just my experience so far with Mantri. But I am more worried about the expenses later on in this dying city without water. There will be no water and other amenities down the line & to avail them it will be very expensive :(

Jackson Philips

Ash, did you finally get anything from Mantri ?

Jackson Philips

Sunny, This is the same with every customer. The Head of CRM is a lady and if you store her number and check out her Profile pic on WhatsApp , you will understand what kind of lady she is. She will talk to you exactly how she looks in the pic.
I had a talk a few discussions with her and she would mute her phone and then when i scream she would unmute and say ” Yes Mr.Jackson ” then she would talk to someone else on the phone while i’m trying to explain the reason why I want my money back.
She has a very condescending attitude.
Like i mentioned before.. just store her number and check her pic on WhatsApp.. you will understand what I’m talking about.. Such a disgusting piece of trash